One vision on critical mission facilities is the SECURITY, not only the control access and CCTV gadgets, but the RISK Analisys that lead the Business Impact Analysis that gives the guidelines to set a Busines Continuity Plan that cover the BCM

This DC system must be take in consideration since the idea DC conception for a new or refurbishment project. This system should include four components in every design: + Deter + Detect + Delay + Detain

Depending on each country laws a Data Center operator can use a different combination of alternatives in the following issues:
-Procedures
-Campus &Building
-Electronics Survilliance & Access

This Security Sistems has to be planned and design in conjunction with the architecture &

Safety designers to assure that every operational procedure will have an integral vision to address the DC needs. But what do you think?